Skip to main content

POOL DECK REMODEL · NAPLES, FL

Naples Pool Deck
Remodel.

The terrace you live on. Cool stone. Honest drainage.

TELL THOMAS ABOUT THIS DECK Or call Thomas: (239) 300-8636

The pool you have.
The deck it needed.

A Naples pool deck remodel is for the pool already in the ground. Cracked concrete. Pavers that cook at 3 p.m. Drains that pond through June and September. Coping that has walked off the beam. The shell can stay. The terrace is the room you live in.

Precision Landscaping & Design rebuilds that room as a system — compacted crushed-stone base, fall away from the water, coping that matches the field, and a joint at the beam so the deck and the shell can move independently. Not a surface glued over last year’s failure.

If the interior needs work, a licensed pool contractor is coordinated under the same contract. You do not run two crews.

TELL THOMAS ABOUT THIS DECK
Travertine pool deck with turf inlay and coping, Naples FL Honed travertine sun shelf and pool coping, Naples FL

DECK · COPING · DRAINAGE

What the remodel includes

01

Travertine or marble decking

Honed or tumbled stone that stays cooler underfoot and grips when wet. Light field. Not polished. Not a dark west-exposure mistake.

02

Overlay — when the slab is sound

New pavers over existing concrete only if the slab drains, is structurally honest, and still clears cage doors and coping. If it has failed, we demo.

03

Matching coping and edge

Coping is the finish at the water — not leftover pallet. Bullnose, custom-cut, or a concrete border. Never spike-in plastic restraint at the shell.

04

Drainage correction

Fall to deck drains or a designed edge. Never toward the pool. Never toward a lawn that already ponds in the wet season. Typical pool-deck base: 4 inches compacted.

05

Outdoor lighting

Step and accent LED with conduit set before the field closes. Warm white. Specified with the deck — not cut in after the pavers are down.

06

Add-ons that finish the backyard

Turf inlay, fire feature, planter irrigation, HIDE skimmer lids. Screen-cage door height and fasteners coordinated — we do not build the enclosure.

EXISTING POOL · EXISTING SHELL

Why remodel the pool you have

A new shell is a different job — permits, gunite, months. If the structure holds water, the high-leverage work is the terrace: the surface you walk, the edge you sit on, the drains that fail first. We build that. When the finish inside the pool is tired, we coordinate a licensed pool contractor. We do not pretend we pour gunite. If the shell is done, that is a Naples pool terrace — not this remodel.

The shell can stay

If it is structurally sound, tearing it out is theater. Remodel the room around it.

Faster than a new pool

Deck work is weeks on site, not a Collier County pool permit cycle. Seasonal clients feel that.

The look is the deck

From the lanai, you read coping and field — not the gunite. Change the terrace, change the house.

Safer underfoot

Slip, heat, and ponding are deck problems. Honed travertine and correct fall fix them.

SCOPED AFTER THE SITE WALK

Naples pool deck remodel packages

Based on a typical 1,000 sq ft terrace. What is included and how long it takes — Thomas prices after he walks the deck. Signature estate work is $150,000 and up.

Essential
Refresh

Honest update: clean field, correct drains, classic edge.

Can include

  • Demo and haul-off — or overlay if the slab is sound
  • Light concrete pavers or standard travertine
  • Bullnose coping
  • Standard deck-drain replacement
  • Cage door height check
  • Samples on site with Thomas

Design focus. A field that looks finished and drains.

On site ~1–2 weeks

Refined
Terrace

Premium stone, a pattern, hidden drains, waterline tile coordinated.

Can include

  • Full demo when overlay is not honest
  • Premium travertine or marble
  • Upgraded coping
  • French pattern or herringbone
  • Hidden deck drains
  • Pool and spa waterline tile — licensed pool contractor
  • Cage door height check
  • Samples on site with Thomas

Design focus. Cool underfoot. Visual interest. Tight edge.

On site ~2–3 weeks

Estate
Environment

The full outdoor room — deck, coping, drainage, interior, light.

Can include

  • Full demo and haul-off
  • Travertine, marble, or large-format porcelain
  • Custom-cut coping — clean edge or waterfall detail
  • New drainage — stainless or hidden
  • Pool interior refinish — licensed pool contractor
  • Waterline tile replacement
  • Cage door height check
  • Samples on site with Thomas

Design focus. One terrace. One finish language. Built to last in salt air.

On site ~3 weeks +

Common upgrades

  • HIDE skimmer lid
  • Cage paint / screw replacement — coordinated
  • Upgraded pool or spa tile
  • Custom tile inlay
  • LED step and accent lights
  • Handrail replacement
  • Artificial turf inlay
  • Irrigation for planter pots

Ready to walk the deck with Thomas?

Talk to Thomas →

FROM WALK TO WALKTHROUGH

How the remodel runs

1

Plan with Thomas

He walks the deck, checks fall, cage doors, and the beam joint. You get a proposal with layout options and material samples — not a guess from photos.

2

Build on a locked date

Demo, base in lifts, coping, field. Daily updates. Client portal so you are not chasing anyone — including from out of state.

3

Walk it and use it

Final walkthrough on the terrace. Care notes for stone. Then it is a room again — morning coffee, guests, August afternoons.

OVERLAY VS DEMO

When overlay is honest

Overlay is a technical call, not a sales trick. Sound concrete, working drainage, elevation that still clears the cage and the coping: overlay can be right. Failed field, ponding, or a beam joint that has opened: demo. Driveways are not overlaid as a default — that load needs a full base. See Naples hardscape and pavers for motor courts.

Most paver decks in Collier County do not need a building permit. Walls over 24 inches, stormwater ties, and AE-zone work do. We check that against Collier County building permits before the start date locks.

This remodel is for you if

  • The pool is staying. The deck is not.
  • You winter here and want the backyard ready for season.
  • You want Thomas on the walk — not a salesman with a catalog.
  • You will pay for the base, not a coat of stone over a failed slab.

It is not for you if

  • You want the lowest-price overlay, no questions asked.
  • You only need a crack patched until you sell.
  • You are shopping a new pool only — that is the terrace page.

FREQUENTLY ASKED QUESTIONS

Naples pool deck remodel questions

Can you overlay pavers on my existing pool deck?

Sometimes. If the slab is sound, drains, and the elevation still clears cage doors and coping, an overlay can be the honest path. If the field has failed, holds water, or the beam joint is gone, we demo. We do not overlay driveways as a default — vehicle load is a different spec.

How long does a Naples pool deck remodel take?

On-site work typically runs 1–3 weeks depending on demo, material, and whether waterline tile or an interior refinish is coordinated with the deck. Material lead time sits in front of that — domestic travertine is often 1–2 weeks; imported porcelain or select stone can run 3–6 weeks. Thomas gives a realistic start date, not an optimistic one.

Is travertine better than pavers or concrete for a Naples pool deck?

For a wet terrace in SWFL sun, honed or tumbled travertine stays cooler underfoot and grips when wet. Concrete pavers work when the color is light and the finish is not polished. Poured concrete cooks and cracks. Dark stone on a west exposure is a mistake you feel every August. Full comparison: the pool deck material guide.

Do I need a new pool, or will a remodel do it?

If the shell is structurally sound, remodel the terrace — deck, coping, drains — and coordinate a licensed pool contractor for interior refinish or waterline tile if the finish is tired. Precision Landscaping & Design does not hold a swimming-pool contractor license. We build the deck and coordinate the pool trade under the same contract when the interior needs work. A new shell is a different page.

Do seasonal homeowners remodel from out of state?

Yes. Many Grey Oaks and Port Royal clients decide from the Northeast or Midwest, then want the backyard ready for season. First conversation can be remote. Thomas walks the deck in person before materials lock. Daily updates and the client portal keep you off the job.

Does a pool deck remodel in Collier County need a permit?

Most paver pool decks and walkways in Collier County do not require a building permit. Permits apply when we add retaining walls over 24 inches, structural work, drainage that ties into county stormwater, or work in AE flood zones. HOA approval is separate — Grey Oaks, Pelican Bay, and Quail West review material and color. We design to that from the first session.

THE TERRACE AS BUILT

Work on existing pools

“I couldn't be more pleased with the incredible job Precision Landscaping & Design did around my new Naples poolside design. From start to finish, they were professional, reliable and truly focused on quality.”

Cory C. · Naples · Google Review · Pool surround

GET STARTED

Tell Thomas About
This Deck.

Prefer to talk? Call.

Existing pool, tired terrace — Thomas walks it himself. A sentence in the form is enough.

(239) 300-8636

Thomas received your message. He'll be in touch personally.